REPORTS AND INCIDENTS

Capture the day.
Connect what matters.

Select an area or operation. Raise an open incident, share a concern, or record your daily KPIs. The Control Room connects each observation to the operational picture.

Open incidents & concernsDaily reportingCustomer-selected KPIsSQCD heatmaps
EXPLORE THE PLATFORMInteractive mockup · Illustrative data
Nordic Manufacturing / Tampere / Control Room Demo workspace
CONTROL ROOM

Tampere Factory

See the whole picture. Act where it matters.

System view / Today8 open incidents · 5 new findings
CONNECTED BY PROCESS.
UNDERSTOOD AS A SYSTEM.

Ongoing incidents 8

REPORTS AND INCIDENTS

Small observations.
A clearer operation.

Raise an incident, share a concern, or capture the day.

Interactive example · Resets on reload

Today’s KPIs

Configured for Packaging

Leave a value empty if it hasn’t been reported. Each KPI has its own unit and target.

Connect today’s observations to the operation.

Incident register

Illustrative data. Reports and KPI changes stay in this page session; no factory systems are connected.

AI ISSUE MINING

The connection behind the incidents.

Different descriptions. A shared operational context.

High confidence · Example
Recurring film feed instability

Product Family B · Lines 3 & 4 · Following changeovers

47 RELATED RECORDS · 4 FUNCTIONS

AI suggests a relationship. Your team reviews the evidence.

ACCUMULATED IMPACT79 hours downtime
21 quality deviations
€143k estimated production impact

5 previous actions found.
3 produced no measurable reduction in recurrence.

INTELLIGENT RESOLUTION ADVISORY

A better next step. Backed by evidence.

Review suggested actions and the results of previous interventions.

Illustrative comparison
12 comparable events identified

Suspected causes: misalignment, component wear, material variation.

7.9
Before intervention
1.1
After intervention
Average events / month · Illustrative data
✓ 86% reduction in recurrence
INVESTIGATION → OUTCOME

Turn evidence into action.

  1. Review similar cases
  2. Evaluate previous interventions
  3. Agree a corrective action
  4. Verify recurrence over time

Prepare a bearing inspection and replacement plan for Line 4.

Local demonstration only. No real action is created.

VERDANT BRAIN

Your Connected
Operations Brain.

People, processes, systems. One shared understanding of what keeps happening.

Simulated workspace
KNOWLEDGE CONSTELLATION8 processes · 9 integrations · 115 reports
MES-001 · Material feed instabilityMES-002 · Packaging jam after changeoverMES-003 · Film feed interruptionMES-004 · Material feed instabilityMES-005 · Packaging jam after changeoverMES-006 · Film feed interruptionMES-007 · Material feed instabilityMES-008 · Packaging jam after changeoverMES-009 · Film feed interruptionMES-010 · Material feed instabilityMES-011 · Packaging jam after changeoverMES-012 · Film feed interruptionMES-013 · Material feed instabilityMES-014 · Packaging jam after changeoverMES-015 · Film feed interruptionMES-016 · Material feed instabilityMESCMMS-001 · Guide adjustment requiredCMMS-002 · Bearing vibration inspectionCMMS-003 · Film roller wear observedCMMS-004 · Guide adjustment requiredCMMS-005 · Bearing vibration inspectionCMMS-006 · Film roller wear observedCMMS-007 · Guide adjustment requiredCMMSQMS-001 · Seal-width deviationQMS-002 · Packaging defect after restartQMS-003 · Product B quality inspectionQMS-004 · Seal-width deviationQMS-005 · Packaging defect after restartQMS-006 · Product B quality inspectionQMS-007 · Seal-width deviationQMS-008 · Packaging defect after restartQMS-009 · Product B quality inspectionQMSERP-001 · Product B material lot reviewERP-002 · Film stock specificationERP-003 · Product B material lot reviewERP-004 · Film stock specificationERPDOWNTIME-001 · Line 4 repeated micro-stopsDOWNTIME-002 · Converting restart delayDOWNTIME-003 · Line 4 repeated micro-stopsDOWNTIME-004 · Converting restart delayDOWNTIME-005 · Line 4 repeated micro-stopsDOWNTIME-006 · Converting restart delayDOWNTIME-007 · Line 4 repeated micro-stopsDOWNTIME-008 · Converting restart delayDOWNTIME-009 · Line 4 repeated micro-stopsDOWNTIME-010 · Converting restart delayDOWNTIME-011 · Line 4 repeated micro-stopsDOWNTIME-012 · Converting restart delayDOWNTIME-013 · Line 4 repeated micro-stopsDOWNTIME-014 · Converting restart delayDOWNTIME-015 · Line 4 repeated micro-stopsDowntime systemDATABASE-001 · Guide vibration above baselineDATABASE-002 · Feed tension measurementDATABASE-003 · Guide vibration above baselineOperational databaseBI-001 · Weekly packaging performanceBI-002 · Delivery trend deviationBI-003 · Weekly packaging performancePower BIFILES-001 · Evening shift observationsFILES-002 · Changeover checklist reviewFILES-003 · Evening shift observationsFILES-004 · Changeover checklist reviewExcel / CSVVERDANT-001 · Receiving · Morning shift reviewVERDANT-002 · Receiving · Safety observationVERDANT-003 · Receiving · Quality checkVERDANT-004 · Receiving · Cost and material usageVERDANT-005 · Receiving · Delivery readinessVERDANT-006 · Receiving · Shift handoverVERDANT-007 · Preparation · Morning shift reviewVERDANT-008 · Preparation · Safety observationVERDANT-009 · Preparation · Quality checkVERDANT-010 · Preparation · Cost and material usageVERDANT-011 · Preparation · Delivery readinessVERDANT-012 · Preparation · Shift handoverVERDANT-013 · Manufacturing Line 1 · Morning shift reviewVERDANT-014 · Manufacturing Line 1 · Safety observationVERDANT-015 · Manufacturing Line 1 · Quality checkVERDANT-016 · Manufacturing Line 1 · Cost and material usageVERDANT-017 · Manufacturing Line 1 · Delivery readinessVERDANT-018 · Manufacturing Line 1 · Shift handoverVERDANT-019 · Manufacturing Line 2 · Morning shift reviewVERDANT-020 · Manufacturing Line 2 · Safety observationVERDANT-021 · Manufacturing Line 2 · Quality checkVERDANT-022 · Manufacturing Line 2 · Cost and material usageVERDANT-023 · Manufacturing Line 2 · Delivery readinessVERDANT-024 · Manufacturing Line 2 · Shift handoverVERDANT-025 · Manufacturing Line 3 · Morning shift reviewVERDANT-026 · Manufacturing Line 3 · Safety observationVERDANT-027 · Manufacturing Line 3 · Quality checkVERDANT-028 · Manufacturing Line 3 · Cost and material usageVERDANT-029 · Manufacturing Line 3 · Delivery readinessVERDANT-030 · Manufacturing Line 3 · Shift handoverVERDANT-031 · Packaging · Morning shift reviewVERDANT-032 · Packaging · Safety observationVERDANT-033 · Packaging · Quality checkVERDANT-034 · Packaging · Cost and material usageVERDANT-035 · Packaging · Delivery readinessVERDANT-036 · Packaging · Shift handoverVERDANT-037 · Dispatch · Morning shift reviewVERDANT-038 · Dispatch · Safety observationVERDANT-039 · Dispatch · Quality checkVERDANT-040 · Dispatch · Cost and material usageVERDANT-041 · Dispatch · Delivery readinessVERDANT-042 · Dispatch · Shift handoverVERDANT-043 · Quality · Morning shift reviewVERDANT-044 · Quality · Safety observationVERDANT-045 · Quality · Quality checkVERDANT-046 · Quality · Cost and material usageVERDANT-047 · Quality · Delivery readinessVERDANT-048 · Quality · Shift handoverVERDANT-049 · Whole factory · Morning shift reviewVERDANT-050 · Whole factory · Safety observationVERDANT-051 · Whole factory · Quality checkVERDANT-052 · Whole factory · Cost and material usageVERDANT-053 · Whole factory · Delivery readinessVERDANT-054 · Whole factory · Shift handoverVerdant Reports and IncidentsvVerdant Brain
100%
● Integration ◉ Process□ ReportSimulated report activity
YOUR PROCESS NODES

Source reports 115

Illustrative data
CROSS-SITE FINDINGS

Someone else has
seen this before.

Useful patterns from your other factories, with the original evidence attached.

One organization · Three factories3 findings to review
TampereHamburg
CS-001 / Packaging / Line 2

The same vibration. An earlier answer.

3 Hamburg reports match symptoms from 12 Tampere cases.

SHARED PATTERNBearing vibration + seal deviation
Suggested match · Review required
TampereMonterrey
CS-002 / Converting / Manufacturing Line 1

Changeover losses with a familiar pattern.

4 Monterrey shift reports show the same timing as the Tampere investigation.

SHARED PATTERNProduct B + feed instability after restart
Suggested match · Review required
HamburgTampere
CS-003 / Supply / Receiving

A receiving check worth sharing.

2 Tampere concerns resemble a resolved Hamburg receiving issue.

SHARED PATTERNMaterial variation + batch handover
Suggested match · Review required

Illustrative findings within one organization. Review local conditions before reusing an intervention.

Your processes are connected. Your intelligence should be, too.Discover the platform
VERDANT · EXAMPLE WORKSPACE

Process details

YOUR KPIS. YOUR TARGETS.

Report what matters to your operation.

Start with Safety, Quality, Cost and Delivery. Select OEE or Energy from the library, or add a custom KPI with its name, unit, target and desired direction. Colors show whether the reported value meets that KPI’s target. Unreported values remain neutral.

Choose “Whole area” for an area-level report, or select an individual operation. Daily values update the heatmap; new incidents remain visible until their status changes. This website demonstration keeps changes in the current page session and resets when reloaded.

FIND THE PATTERN. CHANGE THE OUTCOME.

What is the same problem
costing you across the operation?

Bring a recurring operational challenge. Explore how connected evidence can reveal its wider impact and inform the next intervention.

Book a Demo Discuss your systems, your priorities, and a focused starting point.